Huge Dy.GM (S&T) & Manager (S&T) Post Vacancy – DMRCL

Last Date

Last Date to apply to DMRCL: 11th September, 2019

ADVT No. DMRC/PERS/22/HR/2019(13) Dated: 20/08/2019
Delhi Metro Rail Corporation Ltd
Metro Bhawan, Fire Brigade Lane
Barakhamba Road
New Delhi

Notification For Huge Dy.GM (S&T) & Manager (S&T) Post Vacancy – DMRCL

The Delhi Metro Rail Corporation (DMRC) Ltd, a Joint Venture company with equity participation from Govt. of India and Govt. of National Capital Territory of Delhi has been entrusted with the responsibility of implementation of the rail-based Mass Rapid Transit System for Delhi. The Delhi Metro Rail Corporation, Lifeline of Delhi, prides itself on its ability to nurture its employees through its unique work culture. Today, DMRC empowered by about 14,500 employees with MRTS activities spread over Delhi NCR, Jaipur, Kochi, Mumbai etc., carry about 3 million passengers per day in Delhi & NCR. In addition to the above, DMRC is involved in providing consultancy services to number of cities within India and abroad. To meet with the immediate requirement of experienced personnel working / retired from Railways / Govt. organizations / PSUs for DMRC and its allied projects, applications are invited from retired / experienced, dynamic and motivated persons having experience in S&T works for the following posts in DMRC to be filled, on Contract basis, for DMRC:

JOB DETAILS

1.Name of the post- Dy.GM (S&T)
No of post- 03
Pay Scale- Rs.93,200

How to Apply to Huge Dy.GM (S&T) & Manager (S&T) Post Vacancy – DMRCL

2.Name of the post- Manager (S&T)
No of post- 03
Pay Scale- Rs.82,000

Important

Vacancies are provisional and subject to increase / decrease. ** Candidates shortlisted for the posts of DGM / Manager (S&T) will be paid consolidated remuneration, as per extant policy. The remuneration will be based on their last substantive grade

Vacancy Notification Huge Dy.GM (S&T) & Manager (S&T) Post Vacancy – DMRCL

NOTE: The term of contract of candidates for the post of DGM / Manager (S&T), on re-employment fee basis, shall be till the age of 62 years, beyond which, if required, persons may be continued on consultant fee terms.

Huge Dy.GM (S&T) & Manager (S&T) Post Vacancy - DMRCL 1About Delhi Metro

The Delhi Metro has been instrumental in ushering in a new era in the sphere of mass urban transportation in India. The swanky and modern Metro system introduced comfortable, air conditioned and eco-friendly services for the first time in India and completely revolutionized the mass transportation scenario not only in the National Capital Region but the entire country. Having constructed a massive network of about 373 Km with 271 stations in record time in Delhi, NCR, the DMRC today stands out as a shining example of how a mammoth technically complex infrastructure project can be completed before time and within budgeted cost by a Government agency.  The Delhi Metro Rail Corporation Limited (DMRC) was registered on 3rd May 1995 under the Companies Act, 1956 with equal equity participation of the Government of the National Capital Territory of Delhi (GNCTD) and the Central Government to implement the dream of construction and operation of a world- class Mass Rapid Transport System (MRTS).

The DMRC opened its first corridor between Shahdara and Tis Hazari on 25th December, 2002. Subsequently, the first phase of construction worth 65 kilometres of Metro lines was finished two years and nine months ahead of schedule in 2005. Since then the DMRC has also completed the construction of another 125 kilometres of Metro corridors under the second phase in only four and a half years.

Presently, the Delhi Metro network consists of about 373 Km with 271 stations. The network has now crossed the boundaries of Delhi to reach NOIDA and Ghaziabad in Uttar Pradesh, Gurgaon, Faridabad, Bahadurgarh and Ballabhgarh in Haryana. With the opening of the Majlis Park to Shiv Vihar and Janakpuri West – Botanical Garden Sections, new age trains equipped with the Unattended Train Operation (UTO) technology have been introduced. These trains operate with the Communication Based Train Control(CBTC) signaling technology which facilitate movement of trains in very short frequencies. This network also includes the NOIDA – Greater NOIDA Aqua Line. The Aqua Line has been constructed by DMRC on behalf of the NOIDA Metro Rail Corporation and is also being operated by DMRC currently. In addition, the 11.7 kilometre long Rapid Metro also connects with the Delhi Metro network at Sikanderpur station of Yellow Line. The Rapid Metro provides connectivity within the satellite city of Gurugram.

Eligibility Criterion:

  • DGM / Manager (S&T) I. Essential Experience a. Minimum 3 years’ experience of in Data Presentation / Review of Data of EI/ATC/ATS/TMS/TPWS/Control Tables / Algorithms used in these sub-systems. b. Experience of Signal & Control table/TPWS/TMS and safety circuits design in railway / metro rail signaling applications.
  • Desirable Experience a. Experience in Software tools for the above-mentioned activities.

Screening process: The screening methodology will comprise of Personal Interview. The screening process would judge different facets of knowledge, skills, experience, expertise, aptitude and ability. The candidates will be shortlisted for interview, based on their eligibility / relevant work experience, in the ratio of 1:5, subject to availability of candidates.

No reimbursement on account of travel shall be made to the candidates appearing for the INTERVIEW.

4. Schedule of selection: a. Last date of receipt of duly filled in application (along with relevant documents) through Speed post is 11/09/2019. Incomplete applications or applications received after the due date will be summarily rejected. DMRC shall not be responsible for loss / delay in post.

b. The list of shortlisted candidates shall be uploaded on DMRC website on 23/09/2019 (tentatively) and interview will be held in the first week of October, 2019 at Metro Bhawan, Barakhamba Road, New Delhi (tentatively) (Complete details will be displayed on DMRC website).

c. No separate communication, by post, will be sent to candidates individually. Candidates are required to go through the instructions / schedule for interview displayed on DMRC website and appear for the interview, accordingly along with original copies of testimonials.

d. The final result will be declared by second week of October, 2019. (Tentatively).

Eligible and willing candidates for the aforesaid post may apply as per the application format at Annexure-I. The candidate must enclose all relevant documents in support of qualification, work experience, pay & pay scale (last drawn, in case of superannuated candidates).

The candidates presently employed in Railways / Govt. organizations / Public Sector Undertaking (PSUs) should send their application through proper channel along with Vigilance and D&AR clearance, so as to reach the below mentioned address within the stipulated time. All candidates are required to submit copies of their APARs for the last five years.

The duly filled in application form should be sent in an envelope super scribing the Name of Post on the cover prominently, latest by 11/09/2019, through speed post to the following address:

Chief General Manager (HR)
Delhi Metro Rail Corporation Ltd.
Metro Bhawan, Fire Brigade Lane
Barakhamba Road
New Delhi

IMPORTANT LINKS

Find below all the relevant links related to this employment news/ notification.

VACANCY NOTIFICATIONS
click above to download
the employment notification

APPLY NOW
click above to apply
now to this vacancy

Attachment not found.

Company:
Find more jobs at

City:
Explore job opportunities in

Last Date to Apply:
Apply before to secure your position


Sponsored Links

Indian Railway

    • employment news
    • employment notifications
    • Fresher Jobs
    • Fresher Jobs in Govt Organizations
    • Fresher Recruitment in Govt Organizations
    • Fresher Vacancy
    • Fresher Vacancy in Govt Organizations
    • government jobs
    • government jobs in india
    • government vacancy
    • govt jobs
    • govt vacancy
    • govt vacancy in india
    • Railway Jobs
    • railway jobs in india
    • railway recruitment
    • railway recruitment in india
    • Railway Vacancy
    • rrb
    • rrb employment
    • rrb entrance
    • rrb exam
    • rrb recruitment in india
    • rrb results
    • sarkari naukri in india