Last Date
Last Date to apply to Kochi Metro: 25th July 2019
KMRL/HR/20190702
Kochi Metro Rail Limited
Kochi, India
Notification For Huge Manager(Quality & Safety) Post Vacancy – Kochi Metro Rail Limited
Kochi Metro Rail Limited (KMRL) is inviting eligible candidates to apply online for 4 contractual posts of Executive, Manager and Deputy General Manager.
Interested and Eligible Candidates may apply online by 25-07-2019 , after making sure that they meet the concerned eligibility criteria. All personal and educational details must be mentioned properly.
How to Apply to Huge Manager(Quality & Safety) Post Vacancy – Kochi Metro Rail Limited
JOB DETAILS
1.Name of the Post- Manager(Quality & Safety)
No of post- 01
Pay Scale- E3,Rs.60000-180000/-(IDA)
Qualification
Graduate in any Discipline
Vacancy Notification Huge Manager(Quality & Safety) Post Vacancy – Kochi Metro Rail Limited
Experience
- Minimum 10 years of post qualification experience in Signalling, Telecommunication systems of metro/Railway/Associated Industry out of which minimum 3 years in metro rail associated industry.
- Candidates with valid certification &knowledge in practices of ISO:9001 and BS OHSAS: 18001 is preferred
About Kochi Metro
The Kochi Metro is a rapid transit system serving the city of Kochi in Kerala, India. It was opened to the public within four years of starting construction, making it the fastest completed metro project in India until the Lucknow Metro overtook it. The Kochi metro project is the first metro in the country which connects rail, road and water transport facilities. The first phase is being set up at an estimated cost of ₹51.81 billion (US$750 million). On October 2017, Kochi Metro was named the Best Urban Mobility Project in India by the Urban Development Ministry, as part of the Urban Mobility India (UMI) international conference hosted by the ministry every year.
Then Prime Minister Manmohan Singh laid the foundation stone for the Kochi Metro rail project in 2012, construction work was started in June 2013 and a 13.4 km (8.3 mi) section of the line from Aluva to Palarivattom was opened to passengers on 17 June 2017 by Narendra Modi, the Prime Minister of India. A second 5 km (3.1 mi) section from Palarivattom to Maharaja’s College Stadium was inaugurated on October 3, 2017. Kochi metro also includes the technology for driverless trains and is hoping to implement this in the near future.
Kochi Metro was lauded for its decision to employ Kudumbashree workers and also members of the transgender community. It is the world’s first rapid transit system whose entire management operations are handled by women. The system is also involved in sustainable initiatives with the introduction of non-motorized transport corridors in the city, installation of solar panels for power and vertical garden on every sixth metro pillar. Apart from the regular tickets, it has also adopted a single card, single timetable and a singular command and control. This debit card along with the Kochi One Mobile App will allow passengers to access all modes of public transportation as well as be utilized for mercantile and internet transactions and will introduce the ‘click and collect’ feature in the near future where goods ordered online can be collected in the metro stations. Every Kochi Metro station is designed on a specific theme around Kerala culture and geography.
Tenure
On deputation/contract basis for three years, extendable for further periods on mutually agreed terms and conditions.
Maximum Age Limit(as on 1st July 2019)
45 Years(Age relaxation applicable as per reservation rules)
General Conditions
- Experience (maximum 1 year) and age criteria(maximum 3 years) can be relaxed in case of otherwise exceptionally deserving candidates.
- The number of vacancies shown above is tentative and may undergo change.
- Only shortlisted candidates will be notified for interview, which will be communicated through email only. KMRL reserves the right to shortlist the candidates.
- Applicants employed in Govt./Quasi Govt./ PSUs shall apply through proper channel, after forwarding the advance copy along with the application fee and shall produce a “No Objection Certificate” from their employer at the time of interview.
- Acceptance or rejection of application of the candidates will be the sole discretion of the Management. Incomplete applications are liable to be rejected.
- Applications of candidates attempting to influence or interfere with the selection process will be rejected summarily and he/she will be declared disqualified for future vacancies in KMRL.
- No TA/DA will be paid by KMRL to candidates for attending interview.
How to apply
- Applicants should read the instructions in the website thoroughly before applying.
- Application form may be filled online by selecting the link in KMRL website. The scan copy of the supporting documents should be uploaded, failing which the application will be treated as incomplete.
- Applications forwarded through any other means including fax or e-mail will not be entertained.
- The application fee of Rs.500.00 should be paid online through the payment gateway of Kochi Metro Rail website. No other mode of payment will be entertained. This is nonrefundable under any circumstances.
- The last date of submission of on-line application is 25th July 2019.
IMPORTANT LINKS
Find below all the relevant links related to this employment news / notification.
VACANCY NOTIFICATIONS
click above to download
the employment notification
APPLY NOW
click above to apply
now to this vacancy
Attachment not found.
City:
Explore job opportunities in
Last Date to Apply:
Apply before to secure your position